We install more than 1.6 MWp every working day with own employees and customized equipment (2011: 391 MWp). Together with our customers, we have achieved a top performance for a sustainable future with solar energy.
BELECTRIC installed the ...
- 1st grid-connected CIS thin-film system of Europe (2001)
- 1st thin-film CdTe solar power plant of Europe (2002)
- 1st thin-film solar power plants of Germany, Spain, France
- 1st thin-film PV roof systems of Belgium, U.A.E. and Spain
- 1st grid-connected PV system of the U.A.E.
- 1st solar power plant of India
- 1st solar power plant of the Maldive Islands
- 1st 900V UL certified solar power plant of the U.S.A.
- 1st floating-ground solar power plant of the U.S.A.
- 1st solar power plant with reactive power compensation of the U.S.A.